一道本免费视频-一道本影院-一道本在线观看视频-一道本在线免费视频-一道本在线视频-一道本中文字幕

How to install the copper hose of the shower?

2021-01-12 2300

Pipeline installation is also an important part of our house decoration, reasonable pipeline planning, our days can be more smooth. The use of shower copper tube is relatively extensive, and its function is also very good, but how do we install shower copper tube? Next, Xiaobian will introduce the installation skills of shower copper tube for us.

Shower copper tube

When installing sprinkler copper pipe, pipe clamps or hangers shall be set according to different pipe diameters and requirements, with accurate orientation and flat embedding. The contact between pipe clamps and copper pipes shall be tight, but the appearance of copper pipes shall not be damaged. The copper pipe support made of metal shall be selected for shower copper pipe, and the metal pad shall be added between the copper pipe and the support. The support spacing of copper pipe straight or horizontal device shall meet the requirements of Table 1 below.

The shower copper pipe should be straightened before use. The pipe should be filled with sand before straightening, and then straightened with straightener. In the process of straightening, pay attention not to use too much force, and do not make hammer marks, pits, scratches or rough marks on the surface of the pipe. The residual sand in the pipe should be cleaned in the planning of logistics work. According to the need, take appropriate amount of flux and evenly wipe it on the socket of copper pipe joint and the part where copper pipe is inserted into the joint. When the temperature reaches 650 ~ 750 ℃, the solder is fed into the welding joint. The flame can not directly heat the solder. Under the effect of capillary and wetting, the molten liquid solder can penetrate into the seam, and stop heating when all the solder melts, if heating continues. Solder will continue to penetrate in, not easy to form a full fillet. When installing copper pipe, it is necessary to prevent inverted vertical welding. If necessary, the torch flame should be aligned with the upper part of the head and heated. In order to prevent the solder from flowing down, asbestos rope can be used to wrap under the weldment to stop the flow. After welding, use wet cloth to cool and scrub the joint to stabilize the welding part and remove the slag from brazing.

衛(wèi)浴銅配件廠家

According to the planning drawings, draw the construction sketch of pipeline branch, pipe diameter, diameter change, reserved hole, valve and other accessories orientation, make the symbol in the practical device orientation, measure the practical size of copper pipe by section, and prefabricate according to this. The prefabricated copper pipes shall be transported to the position of the device according to the number and arranged in turn, and then the copper pipes shall be installed in sequence. The copper pipe installation shall be carried out in the order of main pipe first and then branch pipe. A certain distance shall be maintained between the copper pipes of the shower, and the operation space shall be reserved. When installing the copper tube in a row, the straight parts should be parallel to each other. Curve part: when the copper pipe is horizontal or straight, it shall be equidistant from the straight part; when the copper pipe is parallel up and down, the curvature radius of the elbow part shall be consistent. When laying copper pipes through expansion joints, seismic joints and settlement joints, protective measures shall be taken according to the situation

The flushing of copper pipe system shall be carried out after the pressure test of copper pipe is qualified. The water inlet and water outlet of copper pipe should be in proper position to ensure that the debris in the copper pipe system can be washed clean. The sectional area of the drainage pipe shall not be less than that of the scoured copper pipe, and the drainage pipe shall be connected to the drainage ditch. The water supply copper pipe shall be flushed with the system flow rate and the flow rate not less than 1.5m until the water color and transparency at the outlet are consistent with the visual inspection at the inlet. The water containing 20 ~ 30mg / L free chlorine per liter of water was used for disinfection. The water containing chlorine stayed in the copper tube for more than 24h, and then washed again after disinfection.

Article from: bathroom copper accessories manufacturers http://m.zjxingyue.cn/


Recommended news
主站蜘蛛池模板: 日韩欧美有码在线 | 91精品视频观看 | 久久99热这里只有精品国产 | 亚洲视频电影在线 | 日韩综合精品 | 高清有码中文字幕 | 久久福利影视 | 正在播放久久 | 日韩精品免费一区二区在线观看 | 欧美激情视频一二区 | 国产资源在线免费观看 | 一本色道久久综合亚洲二区三区 | 在线观看亚洲电影 | 免费www视频| 中文字幕免费观看全部电影 | 久久人人干 | 99国产一区 | 超碰国产在线观看 | 亚洲精品视频免费在线 | 一级黄视频 | 国产 在线 高清 精品 | 99久久精品一区二区成人 | av888av.com | 日本精品中文字幕在线观看 | 久草www| 国产精品专区h在线观看 | 国产视频在线免费观看 | 九九在线播放 | 亚洲精品午夜aaa久久久 | 国产精品伦一区二区三区视频 | 欧美久久电影 | 99精品免费网 | 欧美精品久久久久久久久久 | 国产精品久久久毛片 | 国产网红在线观看 | 久久美女视频 | 97色综合| 中日韩在线 | 日操干| 精品国产电影一区二区 | 日韩欧美在线观看 | 久久免费在线 | 在线观看久草 | 高清精品在线 | 91在线视频观看免费 | 麻花豆传媒mv在线观看网站 | 99激情网 | 国产精品入口久久 | 蜜臀av性久久久久蜜臀aⅴ四虎 | 久久日韩精品 | 日日夜夜精品免费 | 五月婷婷在线观看 | 96香蕉视频| 日本爱爱免费视频 | 99精品成人 | 人人爽人人舔 | 亚洲免费激情 | 亚洲精品一区中文字幕乱码 | 成年人免费看av | 99re热精品视频 | 国产日韩欧美在线影视 | 日韩丝袜| 91亚洲精品国偷拍自产在线观看 | 精品99久久久久久 | 狠狠的日日 | 在线观看免费视频你懂的 | www.色婷婷| 免费国产在线视频 | 亚洲少妇激情 | 视频在线一区 | 超碰电影在线观看 | 日本黄色免费电影网站 | 日日操夜夜操狠狠操 | 少妇精品久久久一区二区免费 | 亚洲成av人影片在线观看 | 亚洲欧洲日韩在线观看 | 亚洲jizzjizz日本少妇 | 一区二区中文字幕在线 | 国产精品网红直播 | 日韩av图片 | 福利二区视频 | 日韩视频区 | 国产精品热| 国产1区在线 | 国产精品国产三级国产aⅴ无密码 | 免费国产在线精品 | 五月婷婷综合在线观看 | 国产在线黄 | 免费在线观看国产黄 | av久久久 | 日韩在线视频免费观看 | 亚洲国产一区二区精品专区 | 日韩精品资源 | 国产精品亚州 | 久久久精品国产一区二区三区 | 黄色网在线免费观看 | 最近中文字幕久久 | 深爱激情婷婷网 | 日韩精品无码一区二区三区 |